| A top performance 'Down-Under' ... |
|
An assessment of the R.M.I.T. University Bundoora Campus by Chris Drzewucki of Meinhardt Facades revealed a requirement for the installation of remedial brick ties. 9mm x 450mm Thor Helical wall ties were impact driven through pilot-holes in the outer brick skin. across the cavity and into the remote leaf pilot-holes without any alignment failures . Once the remaining 'spin-twisted' tie stocks had been used, the remaining installation utlised the accurately twisted Thor Helical Drive Ties. John Geraghty of Thor Helical Australia explains that "...the improved second generation profile of the Thor Helical wall tie resulted in a dramatic reduction in wastage compared to the previous product. Time saved by not having to extract bent and deformed ties from the hard brick units also improved installation times and costs." |